New Construction Installation

This building was will be an Edward Jones investment brokerage's office when completed. We designed and installed the building's heating and air conditioning system, which included a small gas furnace and central air unit. All of the ductwork will be hidden above a drop ceiling once the builder finishes the interior walls.

 

Heil furnace unit that was just installed in a building that is under construction.

A new Heil gas furnace and central air conditioning system.

 

Gas furnace in an unfinished building.

 

 

Insulated metal hvac ducts in the ceiling of an unfinished hallway in a building under construction.

The ductwork will be hidden above a drop ceiling when the building's interior is completed. The furnace room is at the end of this hallway.

 

Sawhorse with circular saw mounted on it.

We custom build our metal ductwork on site!

 

Insulated metal ductwork above the bare wooden wall frames in a new building under construction.

 

Metal HVAC duct running through the wooden frame of a wall in a building that is being built.

 

Two metal ducts, wrapped in bubble-wrap insulation, sit on a table awaiting installation in a building that is under construction.

All of the metal ductwork is wrapped in insulation to improve energy efficiency.

 

Sheetmetal and insulaton material that will be used for custom-made HVAC ductwork.

Ductwork sheetmetal, elbows, and insulation wrapping await installation.

 

Metal air ducts installed above a drop ceiling in a commercial building under construction.

 

An air vent and flexduct in a drop ceiling.

 

Metal ducts, flexduct, and an air vent in a drop ceiling in a new building.

Ductwork and vents are now in place, waiting for installation of the ceiling tiles.

 

Air ductsabove the drop ceiling in the hallway of a new building under construction.

The hallway walls have been finished by the builder, and we've installed the ceiling vents.

 

A gas furnace with the ducts, exhaust vents, and gaslines all hooked up.

The furnace installation is completed, with all of the gas lines and vent pipes hooked up.

 

Digital thermostat on the wall and vents in the ceiling of the lobby of an office.

The lobby with the digital thermostat on the wall and vents installed in the drop-ceiling.

 

Air vents in a wall near the ceiling.

 

Heil central air conditioning unit.

We also installed central air conditioning.

 

Exhaust vent for a gas furnace on the outside of a building.

The furnace's exhaust vent on the back of the building.

 

Schroyer Heating and Air Conditioning van parked in front of a building under construction.

 

Natural gas regulator and meter unit.

The building's newly installed gas lines for the furnace.